Skip to main content
VIES
Industry solution

Lithium batteries and storage for data centres and IT infrastructure

The problem

One second without power on a rack costs you the SLA and the data.

What we install

Lithium batteries 384–614 V for the UPS, storage to absorb AI-load surges, monitoring of every cell.

  • 6C batteries for short discharges
  • Storage 100–1000 kW
  • BMS with life diagnostics
Data centres and IT — VIES

Context

What drives the equipment selection

A data-centre battery lives in a very particular regime: it sits on standby almost all the time and discharges rarely — but when it does, it delivers high current for a short window, typically 7–20 minutes until the gensets take the load. That dictates high-rate designs at 5–6C and a battery bus of 384–614 V.

The second factor is floor space. A battery room competes with racks, and racks earn money. A lithium string takes roughly a third of the space and needs no separately ventilated room for hydrogen, so the move away from lead is often justified by reclaimed floor area rather than by maintenance savings.

The third is that the load itself has changed. AI racks produce steep power surges that the grid and on-site generation are not always ready for. Here a storage system is added alongside the UPS battery — for smoothing, not for backup.

What we need for a calculation

  • UPS model and rating, voltage class of the battery bus
  • Required autonomy and the load profile
  • What is installed today: type, age and condition of the battery strings
  • Temperature regime and space constraints in the hall

How we work

01

Engineering audit

We go through the specification and the site: load category, required autonomy, operating conditions, what is already installed.

02

Sizing and selection

We size the battery against the real discharge profile — not “with a margin, by eye”. You get 2–3 options with different economics.

03

Supply and commissioning

Delivery from stock or to order, installation, commissioning, training for your operations team.

04

Service and monitoring

Warranty and post-warranty service, remote condition monitoring, replacements scheduled on actual condition.

Q & A

Frequently asked questions

Can a lead string be replaced in a live data centre without downtime?

As a rule yes — the work is planned per power path and per UPS section, with temporary redundancy in place. The sequence and schedule are agreed with your operations team during the audit.

How does battery monitoring connect to the DCIM system?

The BMS publishes data over Modbus TCP or SNMP into your existing monitoring system. No cloud is required — the loop stays inside your perimeter.

First step

Site energy audit — free of charge

Send us the data from the checklist above — we will return a calculation with layout options, dimensions and site requirements. Usually 3–10 working days.

Your task

By clicking the button you agree to the processing of personal data.